How do I hide project base point in Revit?

How do you hide a project base point in Revit?

To hide internal origin in the views, use one of the following options

  1. Open the Revit model in Revit 2020.2.
  2. Click Dynamo Player on Manage tab. Click Browse to folder and select the local folder with the Dynamo script.
  3. Click Edit Inputs command.
  4. Pick True to hide points.
  5. Click Run script.

How do you remove coordinates in Revit?

Next, acquire the coordinates from this project (Manage > Coordinates > Acquire Coordinates > Select the text from the newly linked Revit model). Select the same text again and delete the link. A dialog box will appear, select ‘Delete Link‘.

Where is my project base point Revit?

To see the base point in your revit model, open a site plan and then the visibility graphics window. Expand the Site Category, then make sure the Project Base Point is set to visible. Next select the project base point in the Revit View, and click on the paperclip icon.

IT IS INTERESTING:  How do I convert ANSI to UTF 8?

How do you unlock visibility graphics in Revit?

The Visibility/Graphics window will be greyed out (as shown above) if its included in the View Properties of the View Template. So make sure you go into the View Template and update the Visibility/Graphics or change settings to not included Visibility/Graphics.

How do you move a project base point in Revit without moving a building?

Help

  1. In the site plan view or another view that displays the project base point, select the project base point.
  2. Drag the project base point to the desired location. …
  3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).

How do I set project coordinates in Revit?

Relocate the Model by Specifying Coordinates

  1. Optional: Display the project base point and the survey point in the current view.
  2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
  3. Place the cursor on a reference point of the model. …
  4. Click the reference.

What happens if you delete a level in Revit?

When you delete a level, Revit also deletes associated views and model elements that are hosted by the level (for example: doors, furniture, and rooms). A warning message displays so you can see the full list of items to be deleted with the selected level. You can cancel the deletion request if needed.

How do you move project base point more than 10 miles?

If you are wanting to move the project base point to a new location outside of 10 miles from origin

  1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
  2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.
IT IS INTERESTING:  How do I remove text from an object in Blender?

How do I move Revit to Origin?

To establish the project coordinate system, move the project base point away from the internal origin to another location, such as the corner of a building. If you later want to return the project base point to the internal origin, unclip the project base point, right-click it, and click Move to Startup Location.

What is project base point in Revit?

The project base point can be used to establish a reference for measuring distances and positioning objects in relation to the model. … When you first create a Revit model, the project base point is located at the internal origin. When starting a project, decide where in the model the project base point will be placed.

How do you use project base point?

To make these points visible:

  1. Click View tab > Graphics panel > Visibility/Graphics.
  2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site. …
  3. To display the project base point, select Project Base Point.
  4. To display the survey point, select Survey Point.