What does duplicate as dependent mean in Revit?

Duplicate as a Dependent creates a copy of the view and links it to the original (parent) view, as shown in the Project Browser below. View-specific changes made to the overall view, such as changing the Scale, are also reflected in the dependent (child) views and vice-versa.

What is the difference between duplicate and duplicate with detailing in Revit?

When you select the “duplicate” option, an exact duplicate of the view is created, without the annotation and detailing items. … When you select “Duplicate with Detailing,” the model geometry of the view is duplicated as well as the annotation and detailing elements.

How can duplicate with Dependent be used?

Duplicate as Dependent



Duplicating as a dependent will create identical copies of the original view, the new views are also tied to the original view as child objects. What this means is if you add a dimension in the ordinal view all dependent views will also have the new dimension.

How do you duplicate with detailing in Revit?

To copy the model geometry from an existing view into a new view, right-click the existing view in the Project Browser, and click Duplicate View Duplicate. If you right-click, and click Duplicate View Duplicate with Detailing, both the model geometry and the detail geometry are copied into the new view.

IT IS INTERESTING:  Question: How do I make 3D Furniture in AutoCAD?

What is a dependent view Revit?

Make multiple copies of a view that are dependent on the primary view. All copies, known as dependent views, remain synchronous with the primary view and all other dependent views, so that when view-specific changes (such as view scale and annotations) are made in one view, they are reflected in all views.

How do you duplicate floor plans in Revit?

Solution:

  1. Copy to Clipboard (CTRL+C) or from the Modify ribbon>Clipboard panel, choose Copy.
  2. On the Modify ribbon > Clipboard, click the drop down arrow under the Paste command.
  3. Select “Aligned to Selected Levels”
  4. Choose the Target level (i.e. Level 2)
  5. Switch to a 3D View to see the results.

What is duplicate with detailing?

The Duplicate with detailing option creates a duplicate view including the detail and annotations elements. They are independent from elements of the parent view. The Duplicate as dependent option creates a dependent view that behaves as the parent view.

What type of view do you need to be in to add a level to your project?

Open the section or elevation view to add levels to. On the ribbon, click (Level). Place the cursor in the drawing area and click. Note: As you place the cursor to create a level, if the cursor aligns to an existing level line, a temporary vertical dimension displays between the cursor and that level line.

What kind of view is required to create a roof by extrusion?

Creates a roof by extruding a profile that you sketch. Display an elevation, 3D, or section view.

How do you make a view independent in Revit?

You can convert a dependent view to an independent view. In the Project Browser, right-click a dependent view, and click Convert to independent view.

IT IS INTERESTING:  How do I hide constraints in AutoCAD?

How do you create a Matchline in Revit?

Add a Matchline

  1. Open the primary view from which your dependent views were created.
  2. If crop regions are not visible, click (Show Crop Region) on the View Control Bar. …
  3. Click View tab Sheet Composition panel (Matchline).
  4. Sketch the matchline.
  5. When finished, click Finish Matchline.