How do you do an audit in Revit?

How do you purge and audit in Revit?

Open the file with Audit selected (If the file is workshared, Select Audit and Detach from Central). Do this on a regular basis (weekly or bi-weekly). Purge unused. Do this as many times as necessary until Revit can no longer find elements to purge.

How do I audit a Revit file on BIM 360?

In Revit, click File tab Open (Project).

In the Open dialog, do the following:

  1. Navigate to the folder where the model resides, and select it. …
  2. Select the Audit option.
  3. Click OK.

What does purge unused do in Revit?

Purging a Revit model assists in removing unused families, views, and objects from a project. … So when you purge out a family, its materials now might be unused in the project and when you next launch the Purge Unused dialog you may see additional materials that can be purged from the project.

Can you purge in Revit?

Click Manage tab Settings panel (Purge Unused). The Purge Unused dialog lists views, families, and other objects that can be deleted from the current project. By default, all unused objects are selected for purging. Select or clear check boxes to indicate the objects to purge from the project.

IT IS INTERESTING:  How do you unlock constraints in Revit?

How long does a Revit audit take?

Click “Open.” Revit audits the integrity of your project file and its constituent elements. This process may take several minutes, depending on the size of the project. Once the check is complete, the file opens in the application.

How do you detach from Central in Revit?

Right-click a Revit central file and select Detach from central. The Select detach destination dialog opens. Any eTransmit location and/or backup location in this project will be enabled for selection, and the other locations in the project will be grayed out and disabled from selection.

How do I open Autodesk in Revit?

To open a Revit file, use any of the following methods: Press CTRL+O . On the Home page, under Models or Families, click Open, or click a thumbnail image in the Recent Files list. Click File tab (Open).

How do you purge unused line styles in Revit?

You can delete any user-created line styles.

  1. Click Manage tab Settings panel Additional Settings drop-down Line Styles.
  2. In the Line Styles dialog, select the line style name.
  3. Click Delete.
  4. When prompted to confirm the deletion, click Yes.

How do you purge levels in Revit?

If you want to delete the level but not its associated views or hosted elements, export the details of the warning list. Using that information, locate each item (use the Select by ID tool), and change its associated level. Then delete the level.

How do you purge unused materials in Revit?

To eliminate multiple unused Materials in Revit 2012, go to the Manage tab, and select the Purge Unused command from the Settings panel. When the Purge Unused dialog box opens, expand the Other Styles option at the bottom by picking the plus sign next to it and you will see that one of the options is Materials.

IT IS INTERESTING:  What is an ANSI base?

What is purging in Revit?

Purging: Purging helps remove unused families, views, and objects from a project. The model should be purged after every submittal and milestone to remove the surplus objects that have accumulated in the project. … Warnings: Revit produces a list of potential problems in the project.

How do you purge a family in Revit?

Select the family or type to delete. Tip: To select more than one family or type, press and hold Ctrl while selecting. Do either of the following: Right-click, and click Delete from Project.

How do you purge a wall type in Revit?

If you go into the Project Browser and expand Families, you can then expand the category that contains the family or type that you want to delete. Select the family or type that you want to delete, right-click and select Delete.

All about design